Ingleton Wood
Our BrochuresContact UsWe are hiring
  • our practice
    • About us
    • Our Mission and Values
    • Our Story
    • Practice Management
    • Our sustainability commitment
    • Frameworks
    • The Armed Forces Covenant
    • Awards
    • Testimonials
    • Brochures
  • Our People
    • overview
    • Equality, Diversity and Inclusion
    • Life at Ingleton Wood
    • Careers
    • Apprenticeships
    • Supporting CPD
    • Benefits
    • How to join our practice
    • Our Partnership
      • John Dixon
      • Stuart Norgett
      • David Cresswell
      • Laura Mansel-Thomas
      • Paul Cavalier
      • Simon Gorst
      • Daniel Legg
      • Anni Folan-White
      • Darren Fowler
    • Our Senior Team
  • our services
    • Architecture
      • Concept and Feasibility
      • Masterplanning
      • Planning Applications
      • Detailed Design
      • Visualisation
    • Building Surveying
      • Project Work
      • Expert Witness
      • Surveys
      • Dilapidations
      • Repairs and Maintenance
      • Technical Due Diligence (TDD)
      • Party Wall and Neighbourly Matters
      • Reinstatement Cost Assessments
      • Development Monitoring
      • Cladding
    • Building Services Engineering
      • Mechanical Design
      • Electrical Design
      • Environmental Design
      • Surveys and Asset Registers
      • Management Services
      • Defence and Security
    • Planning
      • Planning Applications and Appeals
      • Planning and Development Appraisals
      • Development Plan Representations
      • Masterplanning
      • Public Consultation
      • Post Planning Services
    • Interior Design
      • Our Service
      • Our Expertise and Adding Value
      • Visualisation
    • Sustainability
      • Climate resilience
      • Sustainability in Planning
      • Regulation Compliance
      • Energy Strategies
      • Passivhaus
      • BREEAM and Code
      • Zero Carbon
      • Post Occupancy Evaluation
      • CPD and Research
      • Health and wellbeing
      • WELL certification
    • Civil Engineering
      • Planning Services
      • Flood Risk Assessment
      • Phase 1 Desk Study
      • Hydraulic Modelling Assessments
      • Drainage Design
      • Sustainable Drainage
      • Highways
      • Enabling Works
      • External Works
    • Structural Engineering
      • Structural Design
      • Foundation Design
      • Basement and Retaining Wall Design
      • Timber Metal Frame Design
      • Structural Inspections
    • Quantity Surveying
    • Project Management
    • CDM and H&S Services
      • What is a CDM Advisor?
      • What is a Principal Designer?
      • Our CDM Service
      • What does a Client have to do?
      • Are you a Duty Holder?
      • Client and Contractors CDM CPD
      • H&S Services
    • The Building Safety Act
      • What is the Building Safety Act?
      • Does the Building Safety Act apply to all buildings?
      • What are the key changes to the Building Safety Act?
      • Changes to the Building Regulations
      • What does the Building Regulations Client have to do?
      • Who is the Accountable Person?
      • How do I prepare for Building Safety Act changes?
    • transport and infrastructure
      • Feasibility and Viability
      • Highway and Access Design
      • Travel Plans
      • Transport planning
  • our sectors
    • Bluelight
    • Commercial
      • Offices
      • Industrial
      • Retail
      • Telecoms
    • Defence
    • Education
    • EV Hub Design Services
    • Fuel Filling Stations
    • Health
    • Heritage and Conservation
    • Laboratories
    • Leisure
    • Residential
    • Social and Community
  • our projects
  • news & socials

Specialist Dementia Care Facilities Tuesday, 9th December 2014

Ingleton Wood are proud to share our newly designed scheme, the £650k Specialist Dementia Care Facilities at Bedford Hospital, which were officially opened to much acclaim on 5th December 2014, by Bedford MP Richard Fuller. Our Director and Ingleton Wood’s project lead, Paul Cavalier, was in attendance at the opening.

Harpur and Elizabeth Wards have been refurbished to provide specialist dementia care as part of the Prime Minister David Cameron’s Dementia Challenge, which will allow Bedford Hospital to deliver outstanding tailored care to these patients, their families and their carers.

This exciting project involved de-cluttering the existing ward areas and used the latest research into dementia design to provide a more comfortable and homely feel for the patients.

Ingleton Wood’s innovative interior design solution included cinema areas with styled seating and Kodak style monitor screens to aid reminiscence with film of the local area, along with extensive use of large scale artwork throughout. The entrance to the wards comprises a historic timeline of museum images through the years whilst on the wards themselves, consistent handrailing to ease mobility was provided, along with carefully designed colour coded bed bays and individually designed bed bay cubicles. Extensive seating and furnishings were incorporated throughout with coordinated way-finding signage, to ensure that patients and their relatives feel as comfortable as possible.

This highly prestigious project has been featured in Bedford Today and Bedford Hospital NHS websites today.

http://www.bedfordtoday.co.uk/news/community-news/video-new-dementia-friendly-wards-opened-at-bedford-hospital-1-6459692

http://www.bedfordhospital.nhs.uk/RunScript.asp?page=82&AR=AR&Article_ID=1072&ap=NewsArticleDetail.asp&p=ASP\~PgDefault.asp

  

 
   

 

 

XPinterestLinkedInEmailShare with other services

Related Links

Tags

hospitaldementiabedford

Contact Us

MapLondonTelephone020 7680 4400
Billericay01277 637800
Cambridge01223 202040
Colchester01206 224270
Norwich01603 666847
Nottingham0115 8654072
Oxford01865 411475
  • Email General Enquiries
  • Email Business Development
  • Email Recruitment / HR
  • Email Health and Safety
  • Email Sustainability
  • Twitter Twitter
  • LinkedIn LinkedIn
  • Instagram Instagram

Ingleton Wood © 2020 | Ingleton Wood LLP is a Limited Liability Partnership registered in England and Wales with No. OC306572, registered address: The Loom, 14 Gower’s Walk, London, E1 8PY. VAT No. 262 7242 10 |

Sitemap | Cookies Policy | Privacy Notice | Disclaimer

This website uses cookies; some may have already been set.

To remove this message, please choose whether to approve, customise or reject the site's use of cookies; your choice will be saved in a cookie. If you would prefer the site to not use cookies at all then please block or otherwise disable cookies in your web browser, though you may find that this prevents certain parts of the site from working correctly.

You can view our cookie policy at the following page: Cookies Policy.