Ingleton Wood
Our BrochuresContact UsWe are hiring
  • our practice
    • About us
    • Our Mission and Values
    • Our Story
    • Practice Management
    • Our sustainability commitment
    • Frameworks
    • The Armed Forces Covenant
    • Awards
    • Testimonials
    • Brochures
  • Our People
    • overview
    • Equality, Diversity and Inclusion
    • Life at Ingleton Wood
    • Careers
    • Apprenticeships
    • Supporting CPD
    • Benefits
    • How to join our practice
    • Our Partnership
      • John Dixon
      • Stuart Norgett
      • David Cresswell
      • Laura Mansel-Thomas
      • Paul Cavalier
      • Simon Gorst
      • Daniel Legg
      • Anni Folan-White
      • Darren Fowler
    • Our Senior Team
  • our services
    • Architecture
      • Concept and Feasibility
      • Masterplanning
      • Planning Applications
      • Detailed Design
      • Visualisation
    • Building Surveying
      • Project Work
      • Expert Witness
      • Surveys
      • Dilapidations
      • Repairs and Maintenance
      • Technical Due Diligence (TDD)
      • Party Wall and Neighbourly Matters
      • Reinstatement Cost Assessments
      • Development Monitoring
      • Cladding
    • Building Services Engineering
      • Mechanical Design
      • Electrical Design
      • Environmental Design
      • Surveys and Asset Registers
      • Management Services
      • Defence and Security
    • Planning
      • Planning Applications and Appeals
      • Planning and Development Appraisals
      • Development Plan Representations
      • Masterplanning
      • Public Consultation
      • Post Planning Services
    • Interior Design
      • Our Service
      • Our Expertise and Adding Value
      • Visualisation
    • Sustainability
      • Climate resilience
      • Sustainability in Planning
      • Regulation Compliance
      • Energy Strategies
      • Passivhaus
      • BREEAM and Code
      • Zero Carbon
      • Post Occupancy Evaluation
      • CPD and Research
      • Health and wellbeing
      • WELL certification
    • Civil Engineering
      • Planning Services
      • Flood Risk Assessment
      • Phase 1 Desk Study
      • Hydraulic Modelling Assessments
      • Drainage Design
      • Sustainable Drainage
      • Highways
      • Enabling Works
      • External Works
    • Structural Engineering
      • Structural Design
      • Foundation Design
      • Basement and Retaining Wall Design
      • Timber Metal Frame Design
      • Structural Inspections
    • Quantity Surveying
    • Project Management
    • CDM and H&S Services
      • What is a CDM Advisor?
      • What is a Principal Designer?
      • Our CDM Service
      • What does a Client have to do?
      • Are you a Duty Holder?
      • Client and Contractors CDM CPD
      • H&S Services
    • The Building Safety Act
      • What is the Building Safety Act?
      • Does the Building Safety Act apply to all buildings?
      • What are the key changes to the Building Safety Act?
      • Changes to the Building Regulations
      • What does the Building Regulations Client have to do?
      • Who is the Accountable Person?
      • How do I prepare for Building Safety Act changes?
    • transport and infrastructure
      • Feasibility and Viability
      • Highway and Access Design
      • Travel Plans
      • Transport planning
  • our sectors
    • Bluelight
    • Commercial
      • Offices
      • Industrial
      • Retail
      • Telecoms
    • Defence
    • Education
    • EV Hub Design Services
    • Fuel Filling Stations
    • Health
    • Heritage and Conservation
    • Laboratories
    • Leisure
    • Residential
    • Social and Community
  • our projects
  • news & socials

Ingleton Wood supports opening of one of Europe’s largest ultra-fast electric vehicle (EV) charging hubs at NEC Birmingham Friday, 3rd November 2023

Ingleton Wood was appointed to help create the new electric vehicle charging site at the NEC Birmingham – one of the largest of its kind in Europe. 

The Practice provided multi provided multi-disciplinary services including planning, architectural, mechanical, electrical, civil and structural engineering, and project management for the site at NEC Campus Birmingham that now benefits from providing revolutionary ultra-fast charging technology.

The new NEC site offers state of the art 300kW charging technology that can charge a typical vehicle from around 15% battery up to 80% in just 15 minutes.

The project marks the second in a series of state-of-the-art facilities that have been supported by Ingleton Wood in partnership with The EV Network (EVN).  

Rob Slusar, Project Manager at Ingleton Wood, said: “We’re extremely proud to have provided our multi-disciplinary services to help design and deliver one of the largest EV charging hubs in Europe at the prestigious NEC Birmingham.

“Our specialist teams worked closely in partnership with EVN to deliver this game-changing EV project, which forms an essential part of the UK’s strategy to make EVs more accessible.

“We’re excited to continue our partnership with EVN and help drive a coordinated programme of EV infrastructure delivery across the nation.

The Gigahub™ will help serve the seven million visitors attracted to the NEC Campus annually, along with a wide range of other road users that make up the area’s average yearly traffic count of 60 million. Accessed via the main NEC Campus through road, less than 1 mile from junction 6 on the M42 and just 2.4 miles from junction 7A for the M6.

Capable of charging 180 EV’s simultaneously, the Gigahub™ boasts cutting-edge ultra-fast 16x 300KW DC chargers, of which two are designated accessible bays. These ultra-fast chargers are capable of charging 30 EVs simultaneously. The site also has a further 150 points for 7KW charging including additional designated accessible bays.

The range of charging speeds offered by the Gigahub™, from 300kW for ultra-fast DC charging to 7kW AC charging for longer stays, addresses the diverse needs of different types of EV drivers.

Reza Shaybani, CEO, and co-founder of the EV Network said: “The launch of one of Europe’s largest ultra-fast Gigahub™ is a massive game changer for EVN and a huge step forward for UK electric vehicle fast charging. 

“EVN has already built dozens of sites across the UK, but the successful completion of this new project launches us onto a much more ambitious growth path, as the leading business in our sector with a range of exciting new partners.

“The NEC was a perfect location that is not only geographically key, but of national significance, to support the EV charging landscape. EVN secured 6.5MVA grid connection, to support the entire infrastructure. The strategic placement and impressive scale of this charging hub within the UK’s transport infrastructure offers reassuring support to drivers journeying between major UK cities.”

Ingleton Wood ENV NEC

XPinterestLinkedInEmailShare with other services

Related Links

Tags

#iwproject#vehiclecharginghub#NECBirmingham#multidisciplinaryservices#ultrafastcharging#chargingtechnology#partnership#EVNetwork

Contact Us

MapLondonTelephone020 7680 4400
Billericay01277 637800
Cambridge01223 202040
Colchester01206 224270
Norwich01603 666847
Nottingham0115 8654072
Oxford01865 411475
  • Email General Enquiries
  • Email Business Development
  • Email Recruitment / HR
  • Email Health and Safety
  • Email Sustainability
  • Twitter Twitter
  • LinkedIn LinkedIn
  • Instagram Instagram

Ingleton Wood © 2020 | Ingleton Wood LLP is a Limited Liability Partnership registered in England and Wales with No. OC306572, registered address: The Loom, 14 Gower’s Walk, London, E1 8PY. VAT No. 262 7242 10 |

Sitemap | Cookies Policy | Privacy Notice | Disclaimer

This website uses cookies; some may have already been set.

To remove this message, please choose whether to approve, customise or reject the site's use of cookies; your choice will be saved in a cookie. If you would prefer the site to not use cookies at all then please block or otherwise disable cookies in your web browser, though you may find that this prevents certain parts of the site from working correctly.

You can view our cookie policy at the following page: Cookies Policy.